High School Renovation - Weekly Updates

 
 
 
Welcome to the High School Renovation Homepage.
 
Updates will be posted as the project progresses.
 
Thanks for your interest!
 
 
 
 
Air Quality Report
 
 
 
 
 
Construction Project Floor Plans
 
 
 
 
Construction Project Reports
 
 
 
 
 
 
 
 
UPDATE - 3/12/2025 regarding High School odor:
“Incident occurred inside the Music addition, 2nd level.   Temporary safety railing posts were tack welded onto the structural steel.  Today's work was to install wall stud framing where the posts are attached.  To remove the  posts, the workman decided to use a gas powered saw with an abrasive wheel. Each post would take a few minutes to remove.  Unfortunately the exhaust and grindings smoke entered the second floor, occupied space, through a temporary closure of the connecting corridor.”